Retail

Supre

Supre

Throughout the past twelve years MP Group's Shopfitting Division has completed over 400 store fitouts/re-fits for Supre, averaging approximately 40 stores per year, ranging in size from 100m2 through to 2000m2 over 3 levels.


G-Star RAW

G-Star RAW

MP Group was contracted for the complete on-site management and fit-out works associated with the G-Star RAW projects. We work closely with their project management team in understanding the client’s international brand.


Element

Element

The Element fit-out at Burleigh Heads was a complete new concept store and consisted of substantial internal and external building alterations using a diverse range of natural materials within the construction and joinery.


T(life)

T(life)

The MP Group have completed numerous T[life] fitouts throughout Queensland and New South Wales. These fitouts vary from installation only of client supplied joinery units, to the complete supply and installation of joinery.


Strandbags

Strandbags

MP Group have completed a number of Strandbag store fitouts ranging in size from 90m2 through to 200m2 located throughout all states of Australia and New Zealand.


Oxford

Oxford

MP Group was contracted for the complete fit-out and on-site management of all sub trades for the Oxford Clothing Robina Store from the initial handover through to practical completion and handover.


Nixon

Nixon

The Nixon store located at Westfield Bondi Junction is the first new concept store opened globally for this brand. MP Group worked closely with our client in completing the final designs for this internationally developed concept.


Billabong

Billabong

Billabong Sydney Arcade


Equip

Equip

Equip's project manager liaised closely with MP Groups shopfitting division to complete these store fit-out's which generally consisted of custom made back-lit slotted wall panelling, mobile gondolas, counters and custom made shop fronts.


Temt

Temt

MP Group were responsible for the initial budget, tendering, liaison with authorities, manufacturing of joinery, site installation and on-site management of all sub-trades for the Temt store fit-out's.


Howards Storage World

Howards Storage World

The Howards Storage World project consisted of the fit-out of 505m2 retail area and a 170m2 storeroom. The project included extensive product display joinery, slatwall panelling to walls, gondolas and mobile counters.


Valleygirl

Valleygirl

MP Group have completed several Valleygirl fit-out's, they generally involve extensive lighting, jewellery display paneling, change rooms, counters and custom made shop front.


Lush

Lush

Lush store fitouts generally consist of extensive custom made solid timber joinery, mobile product display cabinets, timber flooring, counters and shop fronts.


Supanews

Supanews

Supanews projects are very joinery intensive requiring our factory to follow set guidelines from Golden Casket and Supanews to ensure correct display set ups.


Ella Bache

Ella Bache

Ella Bache utilise extensive timber veener panelling within their reception and retreat rooms to give their salons a warm, relaxing feel.


Blockout

Blockout

Due to the shopping centre being an active construction site whilst the Blockout shop fitout was being completed, strict site requirements were adhered to throughout the fitout.